Summary

This document is a presentation slide detailing a financial cost estimate for the construction of a '10 mgd Floridan Plant' (likely a water treatment facility sourcing from the Floridan Aquifer). It lists specific infrastructure costs such as 'Membrane Building w/LPRO system' ($19M) and 'Raw Water Wells & Piping' ($13.5M), culminating in a total conceptual cost of $80,250,000. The document contains a Bates stamp indicating it is part of a House Oversight Committee investigation record.

Organizations (1)

Name Type Context
House Oversight Committee
Document bears Bates stamp HOUSE_OVERSIGHT_016661

Locations (1)

Location Context
Water source for the proposed plant

Key Quotes (1)

"Assumes no additional cost for land."