HOUSE_OVERSIGHT_016661.jpg
1.93 MB
Extraction Summary
0
People
1
Organizations
1
Locations
0
Events
0
Relationships
1
Quotes
Document Information
Type:
Presentation slide / financial cost estimate
File Size:
1.93 MB
Summary
This document is a presentation slide detailing a financial cost estimate for the construction of a '10 mgd Floridan Plant' (likely a water treatment facility sourcing from the Floridan Aquifer). It lists specific infrastructure costs such as 'Membrane Building w/LPRO system' ($19M) and 'Raw Water Wells & Piping' ($13.5M), culminating in a total conceptual cost of $80,250,000. The document contains a Bates stamp indicating it is part of a House Oversight Committee investigation record.
Organizations (1)
| Name | Type | Context |
|---|---|---|
| House Oversight Committee |
Document bears Bates stamp HOUSE_OVERSIGHT_016661
|
Locations (1)
| Location | Context |
|---|---|
|
Water source for the proposed plant
|
Key Quotes (1)
"Assumes no additional cost for land."Source
HOUSE_OVERSIGHT_016661.jpg
Quote #1
Discussion 0
No comments yet
Be the first to share your thoughts on this epstein document