This document is a photograph bearing the Bates stamp HOUSE_OVERSIGHT_026693, indicating it is part of a document production for the U.S. House Oversight Committee. The image depicts a large underground cavern involving the construction of a subway system extension in New York, featuring heavy machinery (likely a tunnel boring machine assembly or similar infrastructure equipment) and construction workers. While the user identifies this as Epstein-related, the image itself appears to be a generic industrial or infrastructure photo, possibly included in a larger report, presentation, or portfolio regarding investments or engineering projects.
| Name | Role | Context |
|---|---|---|
| Unknown Individuals | Construction Workers |
Several workers wearing hard hats and high-visibility safety gear are visible working on the machinery in the tunnel.
|
| Name | Type | Context |
|---|---|---|
| House Oversight Committee |
Implied by the Bates stamp 'HOUSE_OVERSIGHT'.
|
|
| MTA (Metropolitan Transportation Authority) |
Implied by the context of 'subway system extension, New York' (likely the Second Avenue Subway or East Side Access pr...
|
|
| JLG |
Manufacturer of the blue lift visible in the bottom left (identified by visual design and 'IC Power' marking).
|
| Location | Context |
|---|---|
|
Underground construction site referenced in the caption.
|
"Construction of subway system extension, New York"Source
Complete text extracted from the document (113 characters)
Discussion 0
No comments yet
Be the first to share your thoughts on this epstein document