UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
Shift-Day-Date: M/W Sunday, July 21, 2019 Beginning Count: 780 SHU: 71/5
M/W
Daily Sensitive Information:
I/M [REDACTED] at Local Hospice w/USMS Guards
TIME CHRONOLOGICAL EVENTS BC SHU
12:00 AM Lieutenant [REDACTED] assumes duties as the Morning Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. PREA announcement conducted via the Institution Public Address System and/or Radio. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate/Facilities/R&D. Roof Check completed. All secure. Temporary Chit Inventory: #1:2; #2:5; #3:5; #4:6; #5:5; #6:0; Hosp:0 780 71/5
12:00 AM Institution Count in progress
12:00 AM NYPD Phone Check #1056
12:09 AM Body Alarm testing in progress
12:25 AM Body alarm testing completed
12:27 AM Good verbal count announced.
12:27 AM Good Verbal count announced
12:30 AM Clear Institution count announced 780 71/5
3:00 AM Institution Count in progress
3:22 AM Good Verbal count announced
3:25 AM Clear Institution count announced 780 71/5
5:00 AM Institution Count in progress
5:25 AM Good Verbal count announced
5:29 AM Clear Institution count announced 780 71/5
8:00 AM Relieved of duties by Lt. [REDACTED] as D/W Operations Lieutenant 780 71/5
STG International Terrorist phone calls monitored:
WITSEC inquiry(s) was/were received during my tour of duty:
The following Inmate(s) were placed in Administrative Detention:
Name Reg: Number Reason Unit Time AD Order
Ops Lt. [REDACTED]
Ending Count: 780 SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
CONFIDENTIAL SDNY_00012055
EFTA00034692
UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
SHIFT-DAY-DATE: D/W - Sunday, July 21, 2019 Beginning Count: 780 SHU:71/5
D/W
Daily Sensitive Information:
I/M [REDACTED] at Gold crest nursing facility w/USMS Guards.
8:00 AM Lieutenant [REDACTED] assumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable at this time. Fire Watch is in Progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:5; #3:5; #4:6; #5:6; #6:5; Hosp:0
Daily Hand Stamp : GPKJ/LEFT HAND 780 71/5
8:00 AM NYPD Phone Check #1616.
8:03 AM Body Alarm Test Initiated.
8:05 AM Notified That Several Unit Doors will not open from control panel
8:21 AM Body Alarm Testing Complete.
10:00 AM Institutional count in progress.
11:19 AM Good verbal count announced.
11:40 AM Clear institutional count announced. 780 71/5
3:45 PM Institutional lockdown for count.
4:00 PM Relieved of duties by Lt. [REDACTED] as E/W Operations Lieutenant.
Visitation: N/A
Inmates Adults Children Total
ION SCANNING TESTED HITS: 0
STG/High Alert phone calls monitored: 7
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
Name Reg Number Reason Unit TIME A/D Order
Ops Lt [REDACTED]
Act Lt [REDACTED]
Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
CONFIDENTIAL SDNY_00012056
EFTA00034693
UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
SHIFT-DAY-DATE: E/W - Sunday, July 21, 2019 Beginning Count: 780 SHU:71/5
E/W
Daily Sensitive Information.
I/M [REDACTED] at Goldcrest nursing facility w/USMS Guards.
TIME CHRONOLOGICAL EVENTS B/C SHU
4:00 PM Lieutenant [REDACTED] assumes duties as the Evening Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable Fire Watch is in progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:0; #3:0; #4:0; #5:1; #6:0; 780 71/5
4:00 PM The entrance downs to 7 south and 5 south cannot be opened by control center.
4:00 PM Institution count in progress.
4:05 PM NYPD Phone Check #2123.
4:10 PM Body Alarm testing in progress.
4:29 PM Body alarm testing completed.
4:56 PM Good verbal announced
5:02 PM Clear institutional count.
6:00 PM Watch call in progress
8:00 PM Trash run commenced.
9:15 PM Trash run complete.
10:00 PM Institutional count in progress.
10:30 PM Good verbal count announced.
10:46 PM Clear institutional count announced. 780 71/5
12:00 AM Relieved of duties by [REDACTED] M/W Lieutenant. 780 71/5
VISITING: N/A
INMATES ADULTS CHILDREN TOTAL
STG/High Alert phone calls monitored: 5
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
NAME REG NUMBER REASON UNIT TIME A/D ORDER
Ops. Lt. [REDACTED]
Act. Lt. [REDACTED]
Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00; B/A SHU: 00
CONFIDENTIAL SDNY_00012057