EFTA00034692.pdf

311 KB

Extraction Summary

5
People
4
Organizations
8
Locations
4
Events
1
Relationships
4
Quotes

Document Information

Type: Daily lieutenant's log (bureau of prisons)
File Size: 311 KB
Summary

This document is the Daily Lieutenant's Log for the Metropolitan Correctional Center (MCC) in New York for July 21, 2019. It details three shifts (Morning, Day, Evening) and documents significant facility malfunctions, including inoperable fire alarm/sprinkler systems requiring a 'Fire Watch,' broken PA systems, and unit doors (specifically 7 South and 5 South) failing to open from the control panel. The log also notes an unnamed inmate located at a local hospice/Gold Crest nursing facility under USMS guard.

People (5)

Name Role Context
Redacted Morning Watch Operations Lieutenant
Assumed duties 12:00 AM
Redacted Day Watch Operations Lieutenant
Assumed duties 8:00 AM
Redacted Evening Watch Operations Lieutenant
Assumed duties 4:00 PM
Redacted Inmate (I/M)
Located at Local Hospice/Goldcrest nursing facility with USMS Guards
USMS Guards Security
Guarding inmate at hospice

Timeline (4 events)

2019-07-21
Fire alarm and sprinkler system inoperable; Fire Watch in progress.
MCC New York
MCC Staff
2019-07-21
Several Unit Doors will not open from control panel.
MCC New York
MCC Staff
2019-07-21
The entrance downs to 7 south and 5 south cannot be opened by control center.
MCC New York (7 South, 5 South)
MCC Staff
2019-07-21
Inmate at Gold crest nursing facility w/USMS Guards.
Gold crest nursing facility
USMS Guards Redacted Inmate

Relationships (1)

USMS Guards Custodial/Guard Redacted Inmate
I/M [Redacted] at Gold crest nursing facility w/USMS Guards.

Key Quotes (4)

"The fire alarm and sprinkler system are inoperable at this time."
Source
EFTA00034692.pdf
Quote #1
"Notified That Several Unit Doors will not open from control panel"
Source
EFTA00034692.pdf
Quote #2
"Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction."
Source
EFTA00034692.pdf
Quote #3
"The entrance downs to 7 south and 5 south cannot be opened by control center."
Source
EFTA00034692.pdf
Quote #4

Full Extracted Text

Complete text extracted from the document (5,447 characters)

UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
Shift-Day-Date: M/W Sunday, July 21, 2019 Beginning Count: 780 SHU: 71/5
M/W
Daily Sensitive Information:
I/M [REDACTED] at Local Hospice w/USMS Guards
TIME CHRONOLOGICAL EVENTS BC SHU
12:00 AM Lieutenant [REDACTED] assumes duties as the Morning Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. PREA announcement conducted via the Institution Public Address System and/or Radio. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate/Facilities/R&D. Roof Check completed. All secure. Temporary Chit Inventory: #1:2; #2:5; #3:5; #4:6; #5:5; #6:0; Hosp:0 780 71/5
12:00 AM Institution Count in progress
12:00 AM NYPD Phone Check #1056
12:09 AM Body Alarm testing in progress
12:25 AM Body alarm testing completed
12:27 AM Good verbal count announced.
12:27 AM Good Verbal count announced
12:30 AM Clear Institution count announced 780 71/5
3:00 AM Institution Count in progress
3:22 AM Good Verbal count announced
3:25 AM Clear Institution count announced 780 71/5
5:00 AM Institution Count in progress
5:25 AM Good Verbal count announced
5:29 AM Clear Institution count announced 780 71/5
8:00 AM Relieved of duties by Lt. [REDACTED] as D/W Operations Lieutenant 780 71/5
STG International Terrorist phone calls monitored:
WITSEC inquiry(s) was/were received during my tour of duty:
The following Inmate(s) were placed in Administrative Detention:
Name Reg: Number Reason Unit Time AD Order
Ops Lt. [REDACTED]
Ending Count: 780 SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
CONFIDENTIAL SDNY_00012055
EFTA00034692
UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
SHIFT-DAY-DATE: D/W - Sunday, July 21, 2019 Beginning Count: 780 SHU:71/5
D/W
Daily Sensitive Information:
I/M [REDACTED] at Gold crest nursing facility w/USMS Guards.
8:00 AM Lieutenant [REDACTED] assumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable at this time. Fire Watch is in Progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:5; #3:5; #4:6; #5:6; #6:5; Hosp:0
Daily Hand Stamp : GPKJ/LEFT HAND 780 71/5
8:00 AM NYPD Phone Check #1616.
8:03 AM Body Alarm Test Initiated.
8:05 AM Notified That Several Unit Doors will not open from control panel
8:21 AM Body Alarm Testing Complete.
10:00 AM Institutional count in progress.
11:19 AM Good verbal count announced.
11:40 AM Clear institutional count announced. 780 71/5
3:45 PM Institutional lockdown for count.
4:00 PM Relieved of duties by Lt. [REDACTED] as E/W Operations Lieutenant.
Visitation: N/A
Inmates Adults Children Total
ION SCANNING TESTED HITS: 0
STG/High Alert phone calls monitored: 7
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
Name Reg Number Reason Unit TIME A/D Order
Ops Lt [REDACTED]
Act Lt [REDACTED]
Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
CONFIDENTIAL SDNY_00012056
EFTA00034693
UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
SHIFT-DAY-DATE: E/W - Sunday, July 21, 2019 Beginning Count: 780 SHU:71/5
E/W
Daily Sensitive Information.
I/M [REDACTED] at Goldcrest nursing facility w/USMS Guards.
TIME CHRONOLOGICAL EVENTS B/C SHU
4:00 PM Lieutenant [REDACTED] assumes duties as the Evening Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable Fire Watch is in progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:0; #3:0; #4:0; #5:1; #6:0; 780 71/5
4:00 PM The entrance downs to 7 south and 5 south cannot be opened by control center.
4:00 PM Institution count in progress.
4:05 PM NYPD Phone Check #2123.
4:10 PM Body Alarm testing in progress.
4:29 PM Body alarm testing completed.
4:56 PM Good verbal announced
5:02 PM Clear institutional count.
6:00 PM Watch call in progress
8:00 PM Trash run commenced.
9:15 PM Trash run complete.
10:00 PM Institutional count in progress.
10:30 PM Good verbal count announced.
10:46 PM Clear institutional count announced. 780 71/5
12:00 AM Relieved of duties by [REDACTED] M/W Lieutenant. 780 71/5
VISITING: N/A
INMATES ADULTS CHILDREN TOTAL
STG/High Alert phone calls monitored: 5
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
NAME REG NUMBER REASON UNIT TIME A/D ORDER
Ops. Lt. [REDACTED]
Act. Lt. [REDACTED]
Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00; B/A SHU: 00
CONFIDENTIAL SDNY_00012057
EFTA00034694

Discussion 0

Sign in to join the discussion

No comments yet

Be the first to share your thoughts on this epstein document