Type: Construction proposal / scope of work
File Size: 306 KB
Summary

A construction scope of work document dated May 31, 2019, addressed to contractor John Bedminster regarding the 'Little St. James Flag Pole Pool Cabana'. The document lists specific demolition and construction tasks with associated costs totaling approximately $62,353, and directs questions to Bill Terry at a US Virgin Islands phone number.

People (2)

Name Role Context
John Bedminster Contractor
Recipient of the scope of work document
Bill Terry Contact Person
Listed contact for questions, phone number provided

Timeline (1 events)

2019-05-31
Issuance of construction scope for Little St. James Flag Pole Pool Cabana
Little St. James

Locations (1)

Location Context
Site of construction work

Relationships (1)

John Bedminster Professional/Contractor Bill Terry
Bedminster is the contractor addressed; Terry is the contact point for the project.

Key Quotes (2)

"We have received proposals for demolition of the existing and construction of the new Little St. James Flag Pole Pool Cabana - Shaded Roof."
Source
EFTA00001584.pdf
Quote #1
"Remember, this is a lump sum contract and any changes will have to be signed by the contractor and owner."
Source
EFTA00001584.pdf
Quote #2

Full Extracted Text

Complete text extracted from the document (1,814 characters)

31-May-19 Contractor's Name John Bedminster
We have received proposals for demolition of the existing and construction of the new Little St. James Flag Pole Pool Cabana - Shaded Roof. There was quite a variance in the scopes so we have taken the liberty of listing what we expect from the contractor during this project. The list is as follows:
1. Prepare a working drawing. (Architectural quality is not necessary.)
2. General conditions shall be included as part of the line items (not separately).
3. Proposals shall have schedule of values based upon activities listed below:
Demolition of Existing Roof $ 2,500.00
Demolition of Existing Columns $ 600.00
Demolition of Existing Tile Within Footprint $ 2,100.00
Provide Dumpsters Located at Owner's Direction $ 1,800.00
(Barge for Dumpster Hauls Provided by Owner) $
Excavate & Pour 8 New Column Footings $ 3,000.00
Form & Pour 8 New Columns $ 4,000.00
Form & Pour Bond Beam (Alt. Steel Beam Acceptable) $ 4,350.00
Strip & Remove All Formwork $ 1,500.00
Frame Roof with 3"x8" rafters & 3"x10" hips 4/12 Pitch $ 9,500.00
Install 2"x12" Fascia Board Around Roof Perimeter $ 850.00
Install One Layer of 3/4" PT Plywood Decking to Rafters $ 3,129.00
Install Ice & Water Shield to Plywood $ 1,800.00
Install Copper Flashing/Drip Edge to Match Existing $ 580.00
Install Concrete Roof Tile $ 7,500.00
Install & Plaster Durock Ceiling $ 6,500.00
Plaster All exposed Concrete Columns & Beams $ 4,344.00
Install New Coral Stone Tile Per Owner's Instructions $ 4,800.00
Working drawings $
[Obscured Item] $ 3,500.00
[Total] ...353.00
Should you have any questions or require additional information please feel free to contact Bill Terry at (340) 228-6499. Remember, this is a lump sum contract and any changes will have to be signed by the contractor and owner.