Inmate at Gold crest nursing facility w/USMS Guards
I/M [REDACTED] at Local Hospice w/USMS Guards
EFTA00034583.pdf
This document is a Daily Lieutenant's Log from the Metropolitan Correctional Center (MCC) in New York, dated July 21, 2019. It details three shifts (Morning, Day, and Evening watches), noting inmate counts, routine checks, and significant facility malfunctions. Notably, while the morning shift reported fire systems operational, the Day and Evening shifts reported that fire alarms and sprinklers were inoperable (requiring a Fire Watch), the PA system was malfunctioning, and several unit doors (specifically entrances to 7 South and 5 South) could not be opened from the control center.
EFTA00035688.pdf
This document is a Daily Lieutenant's Log for the Metropolitan Correctional Center (MCC) in New York for Sunday, July 21, 2019 (two days prior to Jeffrey Epstein's first reported incident). The logs detailing the Morning, Day, and Evening shifts note significant infrastructure failures, specifically that the fire alarm and sprinkler systems were inoperable requiring a 'Fire Watch,' and the public address system was malfunctioning. Additionally, there were security control failures where unit doors and entrances to 7 South and 5 South could not be opened from the control center.
Discussion 0
No comments yet
Be the first to share your thoughts on this epstein relationship