A presentation slide outlining technical, logistical, and regulatory challenges associated with operating a desalination plant. It highlights issues such as the inefficiency of water production (25 mgd input for 10 mgd output), waste disposal requirements, high energy usage, and potential subjection to water restrictions drafted by the South Florida Water Management District (SFWMD). The document bears a House Oversight Bates stamp.
| Name | Type | Context |
|---|---|---|
| SFWMD |
South Florida Water Management District; drafted proposed year-round water restrictions mentioned in the slide.
|
|
| House Oversight Committee |
Source of the document as indicated by the Bates stamp 'HOUSE_OVERSIGHT'.
|
| Location | Context |
|---|---|
|
Implied location based on the mention of SFWMD rules.
|
"25 mgd facility required to produce 10 mgd potable water."Source
"Brine by-product waste disposal via deep injection well (ocean outfalls no longer permitted for WTPs)."Source
"Not necessarily exempt from proposed year-round water restrictions drafted by SFWMD"Source
Complete text extracted from the document (473 characters)