EFTA00001490.pdf

497 KB

Extraction Summary

4
People
2
Organizations
2
Locations
2
Events
1
Relationships
2
Quotes

Document Information

Type: Architectural floor plan / fbi evidence
File Size: 497 KB
Summary

This document is an architectural floor plan (Drawing A-107) for the 6th floor of Jeffrey Epstein's residence at 9 East 71st Street, New York. It has been annotated by FBI agents SA Margaret Girard and SOS Kimberly Mader in July 2019, referencing Case # 31E-NY-3227571. The plan features hand-drawn outlines marking specific rooms or areas labeled 'HH' and 'II', likely designating locations of evidence or specific interest during a search.

People (4)

Name Role Context
Margaret Girard Special Agent (SA)
Preparer of the document annotation on 7/6/19
Kimberly Mader SOS (Staff Operations Specialist)
Preparer of the document annotation on 7/11/19
Thierry W Despont Architect
Listed on the architectural blueprint header
John L. Altieri Mechanical Engineer
Listed on the architectural blueprint header

Organizations (2)

Name Type Context
FBI
Implied by 'SA' (Special Agent) title and case number format
The Office of Thierry W Despont
Architectural firm that designed the renovations

Timeline (2 events)

2019-07-06
Document annotation/preparation by SA Margaret Girard, likely during a search of the property
9 East 71st Street, New York, NY
2019-07-11
Document annotation/preparation by SOS Kimberly Mader
9 East 71st Street, New York, NY

Locations (2)

Location Context
Subject property address listed on document
Specific location of the floor plan within the building

Relationships (1)

Margaret Girard Colleagues Kimberly Mader
Both listed as preparers on the same FBI evidence document

Key Quotes (2)

"Location: 9 East 71st Street, New York, NY - 6th Floor"
Source
EFTA00001490.pdf
Quote #1
"Case #: 31E-NY-3227571"
Source
EFTA00001490.pdf
Quote #2

Full Extracted Text

Complete text extracted from the document (691 characters)

page 6 of
Date: 7/6/19 Location: 9 East 71st Street, New York, NY - 6th Floor
Case #: 31E-NY-3227571 Preparer: SA Margaret Girard
Date: 7/11/19 Preparer: SOS Kimberly Mader
Direction N
Scale
9 E 71
NEW YORK
THE OFFICE OF
THIERRY W DESPONT
MECHANICAL ENGINEERS
John L. Altieri
STRUCTURAL ENGINEERS
REVISIONS
June 22, 1993 Revisions
August 31, 1993 Revisions
DECEMBER 17, 1993
MILLWORK PACKAGE
SHEET 2
March 1, 1995
REVISION MAY 7, 1995
REVISION 10-25-1995
[Plan Annotations]
HH [inside blue outline]
II [inside red outline]
Corridor + Storage
(NO WALL)
Elevator
Laundry Room
SIXTH FLOOR PLAN
PLAN LEVEL EL + [illegible]
DATE MAY 25, 1993
SCALE 1/4" = 1'0"
DRAWING NO.
A-107
EFTA00001490

Discussion 0

Sign in to join the discussion

No comments yet

Be the first to share your thoughts on this epstein document