Total Conceptual Cost (including mark-ups, contingency, and engineering)
This document is a presentation slide detailing a financial cost estimate for the construction of a '10 mgd Floridan Plant' (likely a water treatment facility sourcing from the Floridan Aquifer). It lists specific infrastructure costs such as 'Membrane Building w/LPRO system' ($19M) and 'Raw Water Wells & Piping' ($13.5M), culminating in a total conceptual cost of $80,250,000. The document contains a Bates stamp indicating it is part of a House Oversight Committee investigation record.